Project Profiles

These project profiles show real environmental consulting work by A3 Environmental Consultants, from Phase I ESAs and UST removals to wetland delineations and brownfield cleanups. Pick a project below to see the client, location and services.

Tree survey crew measuring trunk diameter at breast height

Tree survey project profile: A3E tagged 368 trees in five field days at Lake and McHenry County sites, each with GPS, DBH and condition data for permits.

Environmental site compliance audit at a natural gas power generation facility

An environmental site compliance audit is an on-the-ground inspection that verifies a facility’s day-to-day operations — hazardous materials handling, storage tanks, wastewater, PCB-containing equipment — match its environmental obligations. In the summer of 2026, A3 Environmental Consultants (A3E) paired Phase I Environmental Site Assessments with an environmental site compliance audit program covering 15 power generation

SPCC compliance audit of aboveground oil storage tanks in secondary containment at an Illinois utility facility

An SPCC compliance audit verifies that a facility’s Spill Prevention, Control, and Countermeasure Plan — required under 40 CFR Part 112 for facilities storing oil above regulatory thresholds — is accurate, enforceable, and ready for a regulator’s visit. Since 2020, a Northern Illinois natural gas utility has relied on A3 Environmental Consultants (A3E) to run

Natural gas plant Phase 1 ESA aerial view of the Corinth, Illinois facility

A natural gas plant Phase 1 ESA is an environmental due diligence report that documents the current and historical environmental conditions of a gas processing facility before a purchase, refinance, or expansion. A3 Environmental Consultants (A3E) completed a natural gas plant Phase 1 ESA in Corinth, Illinois for Dawood Engineering, Inc., acting on behalf of

Thumb Naturalization Stream Project Belvidere IL

This channel naturalization project turned a planned concrete channel into native habitat. The City of Belvidere, Illinois engaged C.E.S., Inc. to address chronic sediment accumulation and maintenance challenges in the 6th Street Channel, a municipal stormwater conveyance that had become increasingly difficult and costly to maintain. The City’s original plan called for lining the channel

HUD environmental review for Wood Dale Park District Central Park

When federal dollars fund a community project, the National Environmental Policy Act (NEPA) requires a thorough environmental review before construction begins. For the Wood Dale Park District’s Central Park redevelopment — a $324,475 HUD-funded project in DuPage County, Illinois — that meant a full HUD environmental review: a 24 CFR Part 58 NEPA Environmental Review

UST compliance audit for Illinois OSFM tank inspections

Public utility provider(s) in Northern Illinois rely on A3 Environmental Consultants (A3E) to manage their Underground Storage Tank (UST) removal and closures. In addition, A3E provides UST Compliance Audits to keep our clients on the right side of the Office of the State Fire Marshal (OSFM). Our clients work hard to avoid regulatory compliance issues

NEPA for Inner City Muslim Action Network

When a federally funded health center project moves forward, a NEPA Environmental Assessment is the gatekeeping document that determines whether construction can proceed. The National Environmental Policy Act (NEPA) requires federal agencies to evaluate the environmental consequences of proposed actions before committing resources — and for the Inner-City Muslim Action Network (IMAN), that meant hiring

This project profile covers A3E’s well sampling work at the Thornton Quarry for the Metropolitan Water Reclamation District of Greater Chicago (MWRD). The Golden Gate Bridge is an amazing structure – massive, sitting across a fault line, beautiful and elegant in a way that complements nature and the surrounding city. The Hoover Dam is enormous

Wetland delineation Illinois project site in Lisle, DuPage County

This project profile covers a wetland delineation Illinois regulators verified: a 23-acre site in Lisle, DuPage County. In August 2024, A3 Environmental Consultants completed a wetland delineation for Professional Environmental Engineers, Inc. at a 23-acre site along Lincoln Avenue in Lisle, DuPage County, Illinois. The area, a mix of residential, commercial, and recreational land use,

R1 Water Quality Report Area

Clean water supports public health, economic stability, recreation, and ecological integrity. In 2025, A3 Environmental Consultants (A3E) partnered with the Region 1 Planning Council (R1) to develop a comprehensive Water Quality Report – Our Our Water’s Health in the Rockford Region – for the Rockford Metropolitan Area. Spanning parts of Boone, Ogle, and Winnebago counties,

Strategic Conservation Plan - NLI Protected Lands

A well-designed Strategic Conservation Plan is more than a document, it is a decision-making framework that helps land trusts and public agencies protect the right land, at the right time, for the right reasons. In Northwest Illinois, where working agricultural landscapes intersect with high-value waterways and remnant natural habitats, conservation decisions must balance ecological function,

Watershed Plan Development for the Lower Rock River Basin Project Profile

Counties across Northern Illinois face a familiar challenge: impaired waterways, regulatory pressure, and limited budgets colliding with very real water quality problems. A well-developed watershed plan is often the difference between reacting to impairment listings and proactively improving streams, lakes, and downstream receiving waters. Over the past decade, A3 Environmental Consultants – known as Olson

A3E doing Habitat Enhancement and restoration in Cook County IL

Habitat enhancement is a critical tool for protecting and restoring high-value natural areas in highly urbanized regions like Cook County, Illinois. With more than 69,000 acres of preserves under management by the Forest Preserves of Cook County (FPCC), proactive ecological stewardship is essential to maintain biodiversity, ecosystem services, and public value. Since 2019, A3 Environmental

Cover Photo for the Winneshiek Watershed Plan Project Profile

A well-executed Watershed Plan is one of the most effective tools municipalities have to protect water quality, prioritize infrastructure investments, and meet regulatory expectations without guessing. In 2022, A3 Environmental Consultants (A3E) led development of an EPA-approved Watershed Plan for the Winneshiek Creek watershed in Stephenson County, Illinois. The effort balanced technical analysis, stakeholder priorities,

Wetland Mitigation Bank, Bass Creek Watershed, Afton Wisconsin

A wetland mitigation bank is only as successful as its planning, performance standards, and long-term monitoring. For municipal and government stakeholders, the difference between a functional public asset and a regulatory headache often comes down to early technical decisions and sustained agency coordination. In Afton, Wisconsin, the Bass Creek Wetland Mitigation Bank demonstrates how a

Chicago River South Branch Bubbly Creek Historical Photo

Chicago’s John G. Shedd Aquarium is one of Chicagoland’s most respected cultural and scientific institutions, internationally recognized for its freshwater and marine conservation leadership. Beyond its iconic lakeside campus, Shedd is deeply invested in protecting and restoring the region’s waterways through research, education, and community partnerships. The South Branch Initiative (SBI) is one of Shedd’s

Nonpoint source pollution from agricultural runoff entering an Illinois waterway

What Is Nonpoint Source Pollution? Nonpoint source pollution (NPS pollution) is contamination that enters waterways from diffuse, widespread sources rather than a single identifiable discharge point. Unlike a factory pipe dumping waste into a river, nonpoint source pollution comes from rainfall and snowmelt moving across land — picking up fertilizers, pesticides, sediment, oil, bacteria, and

Drainage Study with wetland Dragonfly

In October 2024, A3 Environmental Consultants completed a wetland delineation study as part of the Meadowlands Drainage Study in Sterling, Whiteside County, Illinois. The site, a 17-acre parcel with a 5.7-acre man-made stormwater pond and a fallow farm field, required a detailed evaluation to assess potential wetlands and their regulatory status. The site was bordered

ACM Survey at College of Dupage

College of DuPage is a public community college with its main campus in Glen Ellyn, Illinois. The college also owns and operates satellite campuses in Addison, Carol Stream, Naperville and Westmont. With more than 20,000 students, the College of DuPage is the second largest provider of undergraduate education in Illinois, after University of Illinois Urbana-Champaign.  Asbestos Containing Materials Survey Before starting any demolition, rehabilitation, or renovation of

Leaking underground storage tank closure at Midway Airport

This leaking underground storage tank closure project at Midway Airport began with an open LUST incident that the IEPA had not closed. The Illinois Air National Guard (IL ANG) is a reserve component of the U.S. Air Force and a state militia unit under the jurisdiction of the Illinois governor. Its 3000 employees are stationed

JET 2

This project profile documents an ongoing airport environmental assessment program, a Preliminary Environmental Site Assessment (PESA) program, A3 Environmental Consultants performs for a major international airline. A PESA is the corridor- and facility-scale equivalent of a Phase 1 ESA — if you’re new to the process, start with what a Preliminary Environmental Site Assessment is

Jet at Chicago O'Hare, site of A3E's PFAS sampling project

The largest airline in the world, consisting of over 100,000 employees, who is the leading United States carrier for flights across both the Atlantic and Pacific, offering direct flights to international destinations contracted A3E in 2024 to perform PFAS sampling (groundwater and tap water testing) at the hangars on the northwest side of Chicago O’Hare

Brownfield Chicago Southwest Development Corporation

This brownfield community involvement project profile covers the Focal Point Community Campus in Chicago. In 2012, what began as the site for a new Saint Anthony Hospital to replace its 121-year old facility and continue providing services and employment to the west and southwest sides of Chicago, evolved to a vision for greater access to

Brownfield Chicago Southwest Development Corporation

This brownfield grant writing project profile covers how A3E helped secure USEPA brownfield grant funding for the Focal Point Community Campus in Chicago. In 2012, what began as the site for a new Saint Anthony Hospital to replace its 121-year old facility and continue providing services and employment to the west and southwest sides of

Brownfield Chicago Southwest Development Corporation

This brownfield remediation project profile covers A3E’s work for Chicago Southwest Development Corporation on the Focal Point Community Campus in Chicago. In 2012, what began as the site for a new Saint Anthony Hospital to replace its 121-year old facility and continue providing services and employment to the west and southwest sides of Chicago, evolved

Perimeter Air Monitoring

This air monitoring project profile covers the four months of perimeter and personnel air monitoring A3E performed, starting September 2023, at a former manufactured gas plant in Chicago. In 1868 Chicago Gas Light and Coke Company built a Manufactured Gas Plant (MGP Plant) to produce coal gas at 1180 N. Crosby Street, Chicago, Illinois. In

Wetland Survey finding Common DuckWeed

In April 2023, a wetland survey was conducted for a 3-acre project area in the town of Wyanet, found in lovely Bureau County, Illinois, intended for cell tower construction. The land use at the time was grazing pasture with a pond and drainage ditch, a wooded area to the east, and a naturalized area to

Hazardous Building Materials Survey

Demolition is a crucial process in the construction industry that involves removing a building or structure to make way for a new project. However, it’s essential to ensure that demolition projects are executed safely and efficiently, which is where the pre-demolition hazardous building materials survey comes in. The purpose of a pre-demolition hazardous building materials

UST Remediation project at a school in Lake Villa Illinois

This UST remediation project profile covers a former gas station owned by the Lake Villa School District. The Lake Villa Illinois School District purchased a property back in 2000. The site is a former gasoline station that had three underground storage tanks (UST) removed in 2009. A release was declared during removal of the USTs

Leaking Underground Storage Tank Projects

A3 Environmental Consultant’s client is the owner of several gas stations. One of these gas stations, located in Alsip, Illinois, experienced a LUST incident (IEMA Incident #20150675, IEPA LPC #0310035069) in 2015. Following the release, approved Stage 1 and Stage 2 investigations were undertaken from 2016 to 2019. However, shortly after submission of the Stage

FCI Pekin NFR letter for a leaking underground storage tank

The site is a Federal Correctional Institution (FCI Pekin).  A3 Environmental Consultants performed a UST Environmental Project at a facility located at 2600 South Second Street in Pekin, Illinois (the ‘Site’). On June 14-15, 2021, Earth Services, contracted by Greenwave Consultants (Greenwave) of Springfield, IL removed one (1) 1,000- gallon used oil Underground Storage Tank

Asbestos survey of asbestos containing materials in a Chicago industrial facility

Illinois Tool Works (ITW) is ranked 201 in Fortune Magazine’s 500 largest US Businesses. Headquartered in Glenview Illinois, ITW is a manufacturer of thousands of different items from Zip Ties to Hobart Mixers. In the course of doing business, ITW was interested in purchasing the former Chase Brass & Copper building which also formerly held

IDOT

This project profile documents a preliminary site investigation from 2022 — an IDOT PSI A3 Environmental Consultants performed at the Vandalia Maintenance Yard. A PSI is the corridor- and facility-scale equivalent of a Phase 2 ESA — if you’re new to the process, start with what a Preliminary Site Investigation (PSI) is and how it

Site remediation Project Profile for Crane Rental Company

A client with 65 years history providing heavy construction equipment rental from 109 facilities located across all 50 states contacted A3 Environmental Consultants seeking help with their purchase of a 24 acre industrial site. They had historic a Phase I ESA and a Phase II ESA showing contamination on the site indicative of heavy automotive

CADD for CCDD

This CADD project profile shows A3E’s drafting and GIS work producing CCDD site figures. Chicago Public Schools (CPS) is the third largest school district in the United States and is entrusted with educating the children of Chicago Illinois. With a total of 658 schools servicing over 400,000 students, CPS aims to provide a safe, healthy

CADD Due Diligence

Busey Bank is headquartered in Champaign Illinois and has lending operations across the midwest and Florida. With a history dating back to 1868, Busey Bank currently has 1400 employees serving 47 locations and is a major business lender in their three state footprint. Due Diligence Figures A3E CADD Services provides due diligence figure packages for

Leaking underground storage tank LUST

A Chicagoland environmental company performed a Phase I ESA as part of a refinancing program for an apartment complex in Chicago Illinois. In the process they identified two underground storage tanks (UST) which were used to serve fuel oil to the HVAC system in years past. That meant an underground oil tank removal. A3E works

Wendler Engineering brownfield redevelopment site in DeKalb, Illinois

This brownfield redevelopment project profile covers a former auto service and dry cleaner site in DeKalb. In 2017 Wendler Engineering Services contacted A3 Environmental Consultants requesting to have their Site Remediation Project (SRP) site closed out so they could sell the property. The site was located in downtown DeKalb, Illinois and was the former location

MWRD Logo

In 2019 A3 Environmental Consultants won their first of two consecutive bids for routine groundwater sampling at the Thornton Quarry, in Thornton Illinois for the Metropolitan Water Reclamation District of Greater Chicago (MWRDGC). The MWRD is responsible for all the water runoff and storm sewer outflow for their management area. They built an enormous public

Dry Cleaner SRP Project for Oxford Bank

Oxford Bank & Trust refinanced a large strip mall in Mundelein Illinois for a closely held real estate company. During the Phase I ESA a dry cleaning facility which was still an active tenant at the strip mall was suspected to have leaked chlorinated solvents, including tetrachloroethylene or PCE. A Phase II ESA was performed

CADD Asbestos Abatement Plans

CBRE is a worldwide real estate services company headquartered in Dallas Texas with satellite offices in Oakbrook Illinois. CBRE is in the business of property management, sales and due diligence for property transactions. As such they employ many professionals who work hard to illuminate risks being taking by buyers and sellers of commercial real estate.

Warehouse Phase II ESA at a former dry cleaner in South Holland, Illinois

A3 Environmental Consultants received a phone call from a landlord and current owner of a warehouse industrial facility. He was very interested in marketing the property for sale and was hamstrung by a Phase I ESA he had purchased where the consultant had identified two Recognized Environmental Conditions (REC) he personally disagreed with. This warehouse

Image of a Industrial Site Phase II ESA

This project profile documents an industrial Phase II ESA A3 Environmental Consultants performed on a former steel fabrication plant in Hammond, Indiana. New to the process? Start with what a Phase II ESA is and what a Phase 2 ESA costs. A steel fabrication business that has been in business for over 100 years contracted A3 Environmental Consultants to perform a

Aqua America

Essential Utilities is a utility company that has stakes in Pennsylvania, Ohio, North Carolina, Illinois, Texas, New Jersey, Indiana and Virginia The company provides drinking water and wastewater treatment infrastructure and services. Aqua America is Essential Utilities water services arm. Aqua America called A3E OES which is a joint venture between A3 Environmental Consultants and

Abandoned plastic manufacturing plant in Rantoul, Illinois

In November of 2021, Integrity Investment Funds (IIF), RFO Holdings, LLC, contacted A3 Environmental (A3E) to perform a Phase I Environmental Site Assessment (ESA) at an abandoned plastic manufacturing plant (an industrial property) located in Rantoul, Illinois (Subject Property). IIF indicated the property was to go to auction in the Spring of 2022 and A3E

CADD - A3E

A3E CADD Services provide complete figure sets for all clients requiring UST removal and excavation sampling. When we identify tanks in the ground that have been damaged or forgotten, action needs to be taken the ensure the safety of the public for the generations to come. Part of this process is to convey to the

Gas station UST removal at Rand River Auto

This gas station UST removal project at Rand River Auto in Streamwood, Illinois was completed through the Illinois Site Remediation Program (SRP). In 2018, A3 Environmental Consultants was contracted to review a Phase I ESA which was completed twenty years earlier. The Phase I ESA identified the property as a former gas station. At the

Hydrovac Truck

Public utility provider(s) in Northern Illinois rely on A3 Environmental Consultants (A3E) to track waste streams, both hazardous and non-hazardous in their systems. A3E performs sample collection and analytical data reviews to determine the correct method for disposal of the material, which includes incineration, grouting in place, or final disposal at a Subtitle D landfill.

PCB waste warning label

Public utility provider(s) in Northern Illinois rely on A3 Environmental Consultants to track waste streams, including PCB waste, both hazardous and non- hazardous in their systems. A3E performs sample collection, analytical data reviews to determine the correct method for disposal of the material which includes incineration, grouting in place or final disposal at a Subtitle