Hydrovac Excavation Spoil Management Project Profile

Hydrovac Truck

Public utility provider(s) in Northern Illinois rely on A3 Environmental Consultants (A3E) to track waste streams, both hazardous and non-hazardous in their systems. A3E performs sample collection and analytical data reviews to determine the correct method for disposal of the material, which includes incineration, grouting in place, or final disposal at a Subtitle D landfill. The tracking, documenting, and manifesting activities are required by the USEPA and other local regulatory agencies.

Hydrovac Excavation Spoil Management

When working around underground utilities it’s important not to damage the infrastructure while trying to open a cavity large enough to perform the necessary maintenance. A method called “hydrovac excavation” is performed where high pressure water is used to expose the utilities so hand digging or machines can utilized to safely perform excavation in the vicinity of the utilities. Hydrovac spoils or soil mixed with water is created from the hydro-excavation activities. Hydrovac spoils are considered special waste and have to be solidified (dried out) prior to disposal or the wet soils could cause slope instability and the landfill. A3E manages the hydrovac spoils and directs them to the appropriate facilities for solidification.

A3 Environmental Consultants collects soil samples in the area of excavation to create a soil profile in advance of excavating to determine the method and location for disposal. A3E prepares and submits the sample profile to the Subtitle-D landfill or solidification facility for approval. Upon receiving the approval, A3E will manifest the soil to ensure the soils are properly disposed. Finally, A3E maintains all of the data in perpetuity. Having the soil profile stored for the future drives costs down when additional work may be performed at the same utility location.

Hydrovac Spoils Management

Hydrovac Spoils Management

Client:

Public Utility Provider(s)

Location:

Northern Illinois

Services:

General Consulting
Hydrovac Excavation Spoil Management
Waste Characterization

Key Staff:

Dave McCoy – Professional Geologist, Final Review
Taylor Closen – Project Management
Jessica Vacala – Project Management

Duration:

2020 – Present

Value:

Estimated $200,000

What you can read next

Clean Construction Demolition Debris CCDD
Understanding CCDD: A Guide for Regular People
Recorder Documents
Leaking Underground Storage Tank – NFR Not Recorded
UST with Free Product Discovered
Leaking Underground Tank – Free Product Discovered

Contamination Remediation

LUST – Leaking Underground Storage Tank
SRP
– Site Remediation Program
CCDD
– Clean Construction Demo Debris
Contaminated –
Soil Management

A3E Home Page

A3E About Us

HQ:   (888) 405-1742
Email:  Info@A3E.com

TOP